Servicing24
Dashboard
Vendors
Maintenance
Reports
MaintenancePM 2026 Q3 014
Create Request
Back to maintenance

Q3 Preventive Maintenance — Data Center Servers

HCI Cluster & Core Banking Servers (5 assets) · Head Office Data Center · 14 Sep 2026 at 22:00

scheduled

Checklist

  • Firmware / BIOS baseline reviewnot checked
  • RAID and disk health verificationnot checked
  • PSU and fan diagnosticsnot checked
  • Thermal and airflow inspectionnot checked
  • iDRAC / iLO log reviewnot checked
  • Backup job verificationnot checked

Visit details

TypePreventive
EngineerMd. Rahim Hasan
Date14 Sep 2026 · 22:00

Notes

Coordinated with the RAID controller replacement on DC-SRV-001 where possible.